SIAM GLOBAL ENGINEERING
Warehouse Construction Steel Structure Engineered for Strength
Siam Global Engineering provides end-to-end steel warehouse design and construction across Thailand. Our engineers coordinate foundations, building-control requirements and wide clear-span interiors for efficient forklift circulation and storage. Detailed BOQs support cost control and dependable delivery. For international markets, we also fabricate export-ready prefabricated steel components engineered for accurate, safe and efficient site assembly.
in Structural Steel Engineering
Prefabricated Warehouse Components
Delivered Across Thailand
and Building Safety Compliance
Steel Warehouse Construction
Built Around Your Operation
Warehouse design and construction aligned with engineering and building-control requirements—safe, durable and matched to the project budget and operating purpose.
-
Materials and General Storage Warehouse
Wide-span steel warehouses with minimal internal columns for efficient material handling, storage and inventory operations.
-
Warehouse with Office
Integrated office, control-room and storage functions planned within one building with clear operational zoning.
-
Cold-Storage Warehouse
Warehouse structures prepared for insulated panels and temperature-control systems serving food, pharmaceutical and controlled-product operations.
-
Commercial and Rental Warehouse
Cost-efficient warehouse layouts for commercial use and long-term leasing, planned around competitive cost per square metre and investment return.
-
High-Load Raised-Floor Warehouse
Warehouses engineered with foundations and high-capacity floors for heavy machinery or products, with settlement risk addressed from the outset.
-
Warehouse Extensions and Upgrades
Warehouse extensions, roof enlargement, metal-sheet replacement and structural strengthening for safe new operating requirements.
The Controls Siam Global Engineering
Applies to Every Warehouse
-
Investigate Soil Before Foundation Design
Because warehouses carry substantial loads, our engineers investigate actual soil conditions before design to specify appropriate pile type and depth and reduce long-term settlement risk.
-
Engineer Wide Clear Spans
Our truss and beam systems are engineered for wide clear spans, improving forklift movement and allowing racking to use the floor area efficiently.
-
Coordinate Building Permits Correctly
We prepare engineering drawings and coordinate the Aor.1 building-permit submission in line with building-control and planning requirements.
Five Steps to Deliver Your Warehouse
Clear Communication. Accountable Delivery.
A transparent process from site survey through handover, with each stage open to review.
-
1
Define Site Requirements
We survey the site and confirm warehouse size, functions and site constraints with the project owner.
-
2
Design and Detailed BOQ
We develop the warehouse layout and issue a detailed BOQ separating materials and labour for transparent cost control.
-
3
Coordinate the Building Permit
Our engineers certify the design and coordinate the Aor.1 warehouse building permit with the relevant authorities.
-
4
Build to Engineering Standards
We complete foundations and on-site steel erection under engineering supervision and active safety control.
-
5
Test Systems and Handover
We complete joint testing of architectural and safety systems before handing over a finished, operational warehouse on the agreed schedule.
Completed Warehouse Projects We Are Proud Of
Siam Global Engineering designs, fabricates and erects structural steel for completed projects across Thailand.
Prefabricated Steel Warehouse Project — Global House
A wide clear-span steel building designed for efficient internal space, high foundation loads and heavy-vehicle circulation. Components were prefabricated in-house for rapid site assembly and timely operational start-up.
- Scope of WorkDesign • Fabrication • Structural Steel Erection
- Building TypeCommercial Building and Large Distribution Center
- Structural SystemWide-Span Steel Roof Truss with Minimal Internal Columns
- Project StatusCompleted • Operational Building Handed Over
Warehouse and Prefabricated Steel Building Service Areas Across Thailand
Eastern Thailand
Central Thailand
Northern Thailand
Northeastern Thailand
Southern Thailand
Western Thailand
FAQ
Warehouse Construction FAQs
How long does a prefabricated steel warehouse typically take?
Duration depends on scale. A typical 500–2,000 m² warehouse takes approximately 3–5 months for fabrication and site assembly, often enabling earlier operation than conventional cast-concrete construction.
Is a prefabricated steel warehouse as strong and safe as a conventional concrete building?
Properly engineered prefabricated steel provides high strength and ductility. Components are factory-produced to relevant Thai Industrial Standards and checked by licensed civil engineers for load distribution, alignment and settlement performance.
What is the minimum warehouse size you undertake?
We deliver complete prefabricated steel warehouses from approximately 300 m² to major facilities spanning tens of thousands of square metres.
How does the BOQ help control the warehouse construction budget?
Within an agreed scope, our detailed BOQ itemises materials and labour against the engineering design, supporting clear contractual pricing before site work begins.
Do you manage the warehouse building-permit process?
Our architects and engineers certify drawings and structural calculations and coordinate the Khor.1 application with local authorities through issuance of the Aor.1 building permit.
Discuss Your Warehouse Project and Request a Quotation
Engineered construction solutions for business growth