Builder: KANE Construction
Project: Geelong Hospital

Date: 2021

HM Development awarded SGE & AES Precast Concrete and Structural Steel modeling and shop detailing.

Key Feature
Supported by Trimble Connect (Tekla software) Engineering and onsite erection interfaces with other trades and disciplines, gave fast track solutions avoiding project execution and timeframes.
Key Feature
Utilising company quality procedures and systems, SGE delivered the project to site ahead of schedule.
Key Feature
Delivering exceptional quality and extensive capabilities in conjunction with modern technology to our client’s key project measures.